Throughout the school year, our class has been visiting the Dream Home being built in Kamloops.
At the beginning of the school year, we had the chance to learn about the SIP (Structural Insulated Panels) construction that the Dream Home Team was installing.
|
Photo courtesy of Trout Creek International Homes |
|
Photo courtesy of Trout Creek International Homes |
| |
And today, I was able to come through the house and see the progress they are making.
|
Kitchen/Dining Room |
|
Love all the windows |
|
The shower in the Master Bedroom Suite |
And on the lower level...
|
Living Room |
|
Bar Area |
|
The lower level's floor is just concrete! They imprinted a pattern on the floor and stuck with it. |
|
There is hardwood on the upper floor, though. And carpet in the bedrooms (wise decision). |
| |
|
Light fixture in one of the bedrooms on the lower level |
It's been a great experience, seeing the Dream Home being built from foundation up (they used ICF Blocks, FYI)... thanks to
Duane Svendson from Trout Creek International Homes for letting me visit and take some pictures.
No comments:
Post a Comment